Construction Update 12/6/2019

December 6th, 2019 by

Baker INFINITI Charleston Construction Update 12/6/2019 The Baker INFINITI project has been moving quickly over the last few weeks as we head for the finish line. On the interior, Acousti hung all ceiling grid. With grid, Watson Electric and D&L were able to set lights, grilles and diffusers. Watford Tile has laid all floor and…

Posted in New Facility

New Building Construction Update 10/28/2019

October 28th, 2019 by

Baker INFINITI Charleston Construction Update 10/28/2019 Grey Interiors wrapped up finishing the walls and hang hanging millwork blocking. Quantum Coatings followed right behind finished drywall priming all available walls. Out front, Craven installed exterior aluminum storefront and O’Cain is working to rough grade the front parking lot for pervious pavers. CSW is continuing with air…

Posted in New Facility

New Building Construction Update 10/14/2019

October 14th, 2019 by

Baker INFINITI Charleston Construction Update 10/14/2019 With in-wall and insulation inspections passing last week, Grey Interiors wasted no time insulating and hanging walls. With in-wall work complete, trade partners are working on above ceiling rough-ins in preparation for ceiling grid. CSW is progressing with air barrier and their stucco system around the back and sides…

Posted in New Facility

New Building Construction Update 10/07/2019

October 7th, 2019 by

Baker INFINITI Charleston Construction Update 10/7/2019 The Baker INFINITI mock-up is coming along nicely and will be looking for city approval shortly. In wall rough-ins are nearly complete and above ceiling rough-ins are in progress for all MEP trades. CSW is progressing with air barrier and their stucco system around the back and sides of…

Posted in New Facility

New Building Construction Update 9/27/2019

September 27th, 2019 by

Baker INFINITI Charleston Construction Update 9/27/2019 The roof complete is now complete with curbs, flashing and the safety rails installed. Once the roof was complete, D&L set their RTU’s. In-wall and above ceiling rough-ins are well underway for all MEP trades. Grey interiors just began topping out second floor walls, keeping all of out MEP…

Posted in New Facility

New Building Construction Update 8/22/2019

August 22nd, 2019 by

Grey is completing the exterior framing and detailing the front entrance.     On the interior, the second floor is completely framed and the first floor is well on its way.           Watson Electric is completing above ceiling rough-in on the second floor. Once walls started going up, crews followed behind…

Posted in New Facility

New Building Construction Update 8/13/2019

August 19th, 2019 by

O’Cain Construction worked hard over the last week and a half to prep and pour our slab on grade. Even with a few pesky showers, they were able to wrap up their work in a timely manner.     As soon as the slab was poured, Grey Interiors started their exterior framing, with a roof…

Posted in New Facility

New Building Construction Update 7/31/2019

August 1st, 2019 by

Macuch Steel wrapped up their structural work last week finishing moment welds, decking, and studs. The team did a great job working quickly and safely to finish ahead of schedule!   O’Cain concrete had an early morning pour last week placing the second-floor slab. However, after getting some rest, the team jumped to the first…

Posted in New Facility

New Building Construction Update 7/23/2019

July 23rd, 2019 by

After some uncooperative weather, O’Cain Construction set remaining anchor bolts and placed concrete footings so steel erection could continue as scheduled. All remaining steel deliveries arrived on-site as steel erection made a big push this past week as well as bolts, joists, deck, safety, and more. Macuch Steel has been working safely and cooperatively and…

Posted in New Facility

New Building Construction Update 7/11/2019

July 12th, 2019 by

Citadel Masonry has wrapped up with all walls topped out at Baker INFINITI. With all required special and city inspections complete, the scaffold has been taken down and the crew de-mobilized. The crew will return in a few weeks to complete grouting of beam pockets and complete punch list. Thanks to the Citadel team for their…

Posted in New Facility
Saved
Saved Vehicles ×

SAVED VEHICLES

You don't have any saved vehicles!

Look for this link on your favorites:

Save

Once you've saved some vehicles, you can view them here at any time.

Contact
Contact Us ×

843-628-1041

Call Now

1513 Savannah Hwy • Charleston, SC 29407

Get Directions

Today's Hours:

Sales: Closed

Service: Closed

Parts: Closed

Baker INFINITI Charleston

1513 Savannah Hwy Charleston, SC

Phone: 843-628-1041

https://goo.gl/maps/uLmBSNEH1q22

Parts

Phone: 843-996-1448

1513 Savannah Hwy Charleston, SC

Sales

Phone: 843-996-1445

1513 Savannah Hwy Charleston, SC

Service

Phone: 843-996-1447

1513 Savannah Hwy Charleston, SC
32.784395 -80.0041443
[schema type="organization" orgtype="LocalBusiness" url="www.bakerinfiniticharleston.com" name="Baker INFINITI Charleston" description="" street="1513 Savannah Hwy" city="Charleston" state="SC" postalcode="29407" country="US" email="" phone="843-628-1041" logo="https://di-uploads-development.dealerinspire.com/bakerinfiniticharleston/uploads/2018/09/thumbnail.png"]
Baker INFINITI Charleston
Baker INFINITI Charleston
1513 Savannah Hwy
Charleston, SC, 29407 US
843-628-1041
https://di-uploads-development.dealerinspire.com/bakerinfiniticharleston/uploads/2018/09/thumbnail.png
Baker INFINITI Charleston 32.784395, -80.0041443.