New Building Construction Update 8/22/2019

August 22nd, 2019 by

Grey is completing the exterior framing and detailing the front entrance.     On the interior, the second floor is completely framed and the first floor is well on its way.           Watson Electric is completing above ceiling rough-in on the second floor. Once walls started going up, crews followed behind…

Posted in New Facility

New Building Construction Update 8/13/2019

August 19th, 2019 by

O’Cain Construction worked hard over the last week and a half to prep and pour our slab on grade. Even with a few pesky showers, they were able to wrap up their work in a timely manner.     As soon as the slab was poured, Grey Interiors started their exterior framing, with a roof…

Posted in New Facility

New Building Construction Update 7/31/2019

August 1st, 2019 by

Macuch Steel wrapped up their structural work last week finishing moment welds, decking, and studs. The team did a great job working quickly and safely to finish ahead of schedule!   O’Cain concrete had an early morning pour last week placing the second-floor slab. However, after getting some rest, the team jumped to the first…

Posted in New Facility

New Building Construction Update 7/23/2019

July 23rd, 2019 by

After some uncooperative weather, O’Cain Construction set remaining anchor bolts and placed concrete footings so steel erection could continue as scheduled. All remaining steel deliveries arrived on-site as steel erection made a big push this past week as well as bolts, joists, deck, safety, and more. Macuch Steel has been working safely and cooperatively and…

Posted in New Facility

New Building Construction Update 7/11/2019

July 12th, 2019 by

Citadel Masonry has wrapped up with all walls topped out at Baker INFINITI. With all required special and city inspections complete, the scaffold has been taken down and the crew de-mobilized. The crew will return in a few weeks to complete grouting of beam pockets and complete punch list. Thanks to the Citadel team for their…

Posted in New Facility

New Building Construction Update 7/1/2019

July 2nd, 2019 by

Citadel Masonry was able to progress this week as they topped out the West wall and turned the corner into the South and East walls. The embed plates continue to be installed and the block has now risen above the existing structure to the south.   The mock-up was able to progress last week with…

Posted in New Facility

New Building Construction Update 6/21/2019

June 24th, 2019 by

With cooperative weather in Charleston this week, the Baker INFINITI project has made forward progress. O’Cain Construction formed and poured two critical concrete lintels to ensure Citadel could continue laying block. Watson Electric finished slab underground rough-ins and called for City inspection. Most importantly, they were able to get the first floor electrical room laid out and…

Posted in New Facility

New Building Construction Update 6/14/2019

June 14th, 2019 by

Over the past few weeks in Charleston, the weather has been very erratic with record high temperatures followed by monsoon like conditions. Even with setbacks, the team is gaining momentum at the Baker INFINITI Showroom Modernization project.   O’Cain Construction pushed forward with excavating footers, installing rebar and placing anchor bolts. It was not an…

Posted in New Facility

New Building Construction Update 5/28/2019

May 28th, 2019 by

Good news in Charleston, we received our building permit last Thursday! With permit in hand, we are now able to move forward with construction.   Earlier in the week, the building corners were confirmed, rebar was delivered and the existing slab was cut for a clean tie into the existing service building.    O’Cain construction…

Posted in New Facility

New Building Construction Update 5/17/2019

May 23rd, 2019 by

It’s been a quiet week on-site at Baker INFINITI as we await our building permit. However, once the building permits are in hand, surveyors will stake the building corners to get the footers started. Luckily, next week’s engineering pre-construction meeting with City officials will allow us to obtain our permit and begin work.   Upcoming…

Posted in New Facility
Saved
Saved Vehicles ×

SAVED VEHICLES

You don't have any saved vehicles!

Look for this link on your favorites:

Save

Once you've saved some vehicles, you can view them here at any time.

Contact
Contact Us ×

843-628-1041

Call Now

1513 Savannah Hwy • Charleston, SC 29407

Get Directions

Today's Hours:

Open Today! Sales: 9am-7pm

Open Today! Service: 7:30am-6pm

Open Today! Parts: 7:30am-6pm

Baker INFINITI Charleston

1513 Savannah Hwy Charleston, SC

Phone: 843-628-1041

https://goo.gl/maps/uLmBSNEH1q22

Parts

Phone: 843-996-1448

1513 Savannah Hwy Charleston, SC

Sales

Phone: 843-996-1445

1513 Savannah Hwy Charleston, SC

Service

Phone: 843-996-1447

1513 Savannah Hwy Charleston, SC
32.784395 -80.0041443
[schema type="organization" orgtype="LocalBusiness" url="www.bakerinfiniticharleston.com" name="Baker INFINITI Charleston" description="" street="1513 Savannah Hwy" city="Charleston" state="SC" postalcode="29407" country="US" email="" phone="843-628-1041" logo="https://di-uploads-development.dealerinspire.com/bakerinfiniticharleston/uploads/2018/09/thumbnail.png"]
Baker INFINITI Charleston
Baker INFINITI Charleston
1513 Savannah Hwy
Charleston, SC, 29407 US
843-628-1041
https://di-uploads-development.dealerinspire.com/bakerinfiniticharleston/uploads/2018/09/thumbnail.png
Baker INFINITI Charleston 32.784395, -80.0041443.