New Building Construction Update 10/07/2019

October 10th, 2019 by

The Baker INFINITI mock-up is coming along nicely and will be looking for city approval shortly. In wall rough-ins are nearly complete and above ceiling rough-ins are in progress for all MEP trades. CSW is progressing with air barrier and their stucco system around the back and sides of the building.   Grey interiors is…

Posted in New Facility

New Building Construction Update 8/27/2019

September 30th, 2019 by

The roof complete is now complete with curbs, flashing and the safety rails installed. Once the roof was complete, D&L set their RTU’s. In-wall and above ceiling rough-ins are well underway for all MEP trades. Grey interiors just began topping out second floor walls, keeping all of out MEP trade partners moving along. Upcoming Construction…

Posted in New Facility

The 2020 INFINITI QX60 Brings Style and Comfort to the Road

August 26th, 2019 by
2020 INFINITI QX60 parked in front of music store

The 2020 INFINITI QX60 is a luxury crossover SUV that sets the bar high. It’s handsome, designed for comfort and balanced performance. There are plenty of features available for the new model year, which you can learn more about in our overview. What You’ll Love About the 2020 INFINITI QX60 Bold Design The 2020 INFINITI…

Posted in Uncategorized

New Building Construction Update 8/22/2019

August 22nd, 2019 by

Grey is completing the exterior framing and detailing the front entrance.     On the interior, the second floor is completely framed and the first floor is well on its way.           Watson Electric is completing above ceiling rough-in on the second floor. Once walls started going up, crews followed behind…

Posted in New Facility

New Building Construction Update 8/13/2019

August 19th, 2019 by

O’Cain Construction worked hard over the last week and a half to prep and pour our slab on grade. Even with a few pesky showers, they were able to wrap up their work in a timely manner.     As soon as the slab was poured, Grey Interiors started their exterior framing, with a roof…

Posted in New Facility

New Building Construction Update 7/31/2019

August 1st, 2019 by

Macuch Steel wrapped up their structural work last week finishing moment welds, decking, and studs. The team did a great job working quickly and safely to finish ahead of schedule!   O’Cain concrete had an early morning pour last week placing the second-floor slab. However, after getting some rest, the team jumped to the first…

Posted in New Facility

New Building Construction Update 7/23/2019

July 23rd, 2019 by

After some uncooperative weather, O’Cain Construction set remaining anchor bolts and placed concrete footings so steel erection could continue as scheduled. All remaining steel deliveries arrived on-site as steel erection made a big push this past week as well as bolts, joists, deck, safety, and more. Macuch Steel has been working safely and cooperatively and…

Posted in New Facility

New Building Construction Update 7/11/2019

July 12th, 2019 by

Citadel Masonry has wrapped up with all walls topped out at Baker INFINITI. With all required special and city inspections complete, the scaffold has been taken down and the crew de-mobilized. The crew will return in a few weeks to complete grouting of beam pockets and complete punch list. Thanks to the Citadel team for their…

Posted in New Facility

New Building Construction Update 7/1/2019

July 2nd, 2019 by

Citadel Masonry was able to progress this week as they topped out the West wall and turned the corner into the South and East walls. The embed plates continue to be installed and the block has now risen above the existing structure to the south.   The mock-up was able to progress last week with…

Posted in New Facility

New Building Construction Update 6/21/2019

June 24th, 2019 by

With cooperative weather in Charleston this week, the Baker INFINITI project has made forward progress. O’Cain Construction formed and poured two critical concrete lintels to ensure Citadel could continue laying block. Watson Electric finished slab underground rough-ins and called for City inspection. Most importantly, they were able to get the first floor electrical room laid out and…

Posted in New Facility
Saved
Saved Vehicles ×

SAVED VEHICLES

You don't have any saved vehicles!

Look for this link on your favorites:

Save

Once you've saved some vehicles, you can view them here at any time.

Contact
Contact Us ×

843-628-1041

Call Now

1513 Savannah Hwy • Charleston, SC 29407

Get Directions

Today's Hours:

Sales: Closed

Service: Closed

Parts: Closed

Baker INFINITI Charleston

1513 Savannah Hwy Charleston, SC

Phone: 843-628-1041

https://goo.gl/maps/uLmBSNEH1q22

Parts

Phone: 843-996-1448

1513 Savannah Hwy Charleston, SC

Sales

Phone: 843-996-1445

1513 Savannah Hwy Charleston, SC

Service

Phone: 843-996-1447

1513 Savannah Hwy Charleston, SC
32.784395 -80.0041443
[schema type="organization" orgtype="LocalBusiness" url="www.bakerinfiniticharleston.com" name="Baker INFINITI Charleston" description="" street="1513 Savannah Hwy" city="Charleston" state="SC" postalcode="29407" country="US" email="" phone="843-628-1041" logo="https://di-uploads-development.dealerinspire.com/bakerinfiniticharleston/uploads/2018/09/thumbnail.png"]
Baker INFINITI Charleston
Baker INFINITI Charleston
1513 Savannah Hwy
Charleston, SC, 29407 US
843-628-1041
https://di-uploads-development.dealerinspire.com/bakerinfiniticharleston/uploads/2018/09/thumbnail.png
Baker INFINITI Charleston 32.784395, -80.0041443.